Planned intervention: On Wednesday April 3rd 05:30 UTC Zenodo will be unavailable for up to 2-10 minutes to perform a storage cluster upgrade.

There is a newer version of the record available.

Published October 5, 2018 | Version v1
Other Open

CEMCAP economic model spreadsheet

Description

Excel spreadsheet for calcualtion of cost of clinker and cost of CO2 avoided for CO2 capture in the cement industry.

Files

Files (5.6 MB)

Name Size Download all
md5:bd7943d49f22f0de839d80f645d93580
5.6 MB Download

Additional details

Funding

CEMCAP – CO2 capture from cement production 641185
European Commission